July 20, 2026 · 5 min read

Short answer: paving or repaving a commercial parking lot in the GTA follows a clear sequence: site assessment, design and drainage planning, permits where needed, milling or excavation, base repair, paving in two lifts (a binder course and a surface course), then line painting and signage. Most of the planning effort goes into one question: how do you keep tenants, customers and deliveries moving while the work happens? The answer is phasing.

Who this guide is for

Property managers, plaza owners, condominium boards, church and school facility managers, and business owners responsible for a lot anywhere from Mississauga and Brampton to Markham, Pickering and Ajax. If you manage trucks and loading docks rather than cars, also read our industrial asphalt paving guide.

Step 1: Assess what the lot actually needs

Not every tired lot needs full replacement. We walk the site and map the problems:

  • Surface wear and fine cracking can often be handled with crack sealing and sealcoating.
  • Localized failures such as potholes and alligator cracking at entrances, dumpster pads and drive lanes usually need cut-and-patch repairs.
  • Widespread failure, ponding or settlement points to base or drainage problems that call for milling and repaving, or full reconstruction.

Our older posts on three causes of parking lot breakdowns and why pothole repair matters explain the common culprits.

Step 2: Plan drainage and layout

Water is what destroys parking lots. Before paving, confirm catch basins are working, slopes carry water to them, and there are no low spots. Repaving is also the cheapest moment to fix layout: drive aisle widths, fire routes, traffic flow and the number and placement of accessible spaces.

Step 3: Accessibility (AODA) requirements

Under Ontario’s Integrated Accessibility Standards (O. Reg. 191/11), obligated organizations that build a new off-street parking lot or redevelop an existing one they intend to maintain must meet accessible parking requirements. Existing lots that are not being redeveloped do not have to be changed to comply. Where the rules apply, they set out two types of accessible spaces (Type A, a wider van-accessible space at least 3,400 mm wide, and Type B at least 2,400 mm wide), access aisles, signage, and a minimum number of spaces based on lot size, for example:

Total parking spaces Minimum accessible spaces
1–12 1 (Type A)
13–100 4% of total
101–200 1 plus 3% of total
201–1,000 2 plus 2% of total

Municipal by-laws and site plan approvals can add their own requirements, so confirm with your municipality and, where needed, your engineer before line painting. We plan accessible layout into the work rather than treating it as an afterthought.

Step 4: Phase the work to stay open

Most commercial clients can’t close the whole lot. Common approaches:

  • Sections: pave one half or one zone at a time, with temporary signage and coned traffic routes.
  • Off-hours: evening, overnight or weekend work for retail plazas and restaurants.
  • Entrance staging: keep at least one entrance and the fire route open throughout.
  • Tenant notice: a simple schedule sent to tenants a week ahead prevents most complaints.

Step 5: Milling, base repair and paving

If the base is sound, the old surface is milled (ground down) and the material recycled, which keeps curb heights and drainage in place. Failed areas are excavated and rebuilt with compacted granular. The lot is then paved in two lifts: a coarser binder course (commonly HL8) for strength and a finer surface course (commonly HL3) for a tight, durable finish. Depths depend on traffic. See how thick asphalt should be for typical builds.

Step 6: Line painting, signage and reopening

Once the asphalt has cooled, stalls, arrows, fire routes, crosswalks and accessible spaces are painted. Cars can generally use the lot within a day or two; heavy trucks should wait longer, and the surface keeps curing for months.

How long does a commercial paving project take?

A small plaza lot can often be milled and repaved in a few days. Larger sites, full reconstructions and phased jobs take longer. Weather and plant availability matter too: GTA asphalt plants generally run from April to late November, and fall booking fills quickly (see can you pave asphalt in the fall?).

Protecting the investment

A new lot should get crack sealing as soon as cracks appear, sealcoating on a regular cycle, and a walk-through every fall. Our pre-winter parking lot maintenance checklist covers exactly what to do before snow season.

Frequently asked questions

How long does it take to pave a commercial parking lot?

A small lot can often be milled and repaved in a few days. Larger lots, full reconstructions and phased projects take longer and are scheduled around business hours.

Can my business stay open during parking lot paving?

Usually, yes. Work is phased by section or done during evenings and weekends, with at least one entrance and the fire route kept open.

What is the difference between milling and repaving and full replacement?

Milling removes the top layer and replaces it while keeping the existing base. Full replacement excavates down to rebuild the base, which is needed when the base or drainage has failed.

Do I have to add accessible parking when I repave?

Under Ontario’s Integrated Accessibility Standards, obligated organizations must meet accessible parking requirements when building or redeveloping a lot they intend to maintain. Existing lots that are not redeveloped do not have to be changed. Confirm requirements with your municipality.

How often should a parking lot be sealcoated?

Commonly every two to three years, with crack sealing as needed in between, depending on traffic and condition.

Related reading

Learn more about our parking lot paving and commercial asphalt paving services across the GTA, including Mississauga, Brampton, Markham and Vaughan.

Get a written quote from AMPAC

Planning a lot repave next season? AMPAC Paving & Concrete has paved driveways, parking lots and commercial sites across the GTA for more than 25 years with our own crews and equipment. We are fully insured, WSIB-covered, and every quote is written and itemized. Book a free site visit or call 416-802-1632.

Book a free site visit

We measure, probe the base and check drainage, then send an itemized written quote within 48 hours. No obligation and no sales pitch.

Call now Free site visit