Serving Toronto & the GTA since 1998 Fully insured & WSIB covered
Free on-site estimates 416-802-1632
AMPAC Paving & Concrete Limited
Aerial view of a commercial plaza parking lot
Shopping centres & plazas

Shopping centre & plaza paving

Paving, repaving and repairs for shopping centres, strip plazas and retail parking lots across the GTA, phased so stores stay open and customers keep parking.

Keep the stores open while the lot gets done

A plaza lot never really closes. Customers park all day, delivery trucks use the drive aisles, and garbage and emergency vehicles need clear routes. That traffic, plus plows and salt every winter, is why retail lots fail first at entrances, drive aisles and dumpster pads.

We survey the lot, separate what can be repaired from what has to be rebuilt, and price them separately. Sound areas are milled and overlaid; failed areas are excavated and rebuilt with compacted granular and two lifts of asphalt where trucks run.

The work is phased by section, with evening and weekend paving where it makes sense, at least one entrance kept open, and a written schedule you can send to tenants ahead of time.

What's included

✓Phased repaving by section
✓Mill and overlay or full-depth reconstruction
✓Drive aisles and truck routes built for delivery loads
✓Catch basin and drainage corrections
✓Curbs, islands and sidewalks
✓Evening and weekend scheduling
Who we do this for

Who we work with

Book a Site Visit
→Plaza and shopping centre owners
→Property managers with multiple retail sites
→Retail tenants responsible for their own lot
→Condo and mixed-use buildings with ground-floor retail

How the job runs, step by step

01

Site survey

We map failures, drainage, truck routes and how the lot is used through the day.

02

Phased quote

Repair and rebuild priced separately, with a phase plan and schedule.

03

Mill, rebuild, pave

Sound areas milled and overlaid; failed areas rebuilt; two lifts where trucks run.

04

Reopen

Each phase reopened as it is done, with the site cleaned up behind us.

What we get right

Where plaza lots fail first

Book a Site Visit

Entrances

Every vehicle crosses them, often turning. They need the heaviest section on the lot.

Drive aisles

Delivery trucks rut the wheel paths. Two-lift asphalt over a proper base stops it.

Dumpster pads

Garbage trucks put heavy point loads here. Concrete pads are often the better choice.

Low spots by catch basins

Settled frames and ponding break the surface around them every winter.

Plaza paving questions

Can the stores stay open while you pave?

Yes. We pave in phases, keep at least one entrance and the fire route open, and schedule evenings or weekends where the plaza needs it.

How long does a plaza lot take?

A small strip plaza can often be milled and repaved in a few days. Larger centres and full reconstructions take longer and are planned around business hours.

Do we need to add accessible parking when we repave?

Under Ontario’s Integrated Accessibility Standards, organizations that build or redevelop a parking lot they intend to maintain must meet accessible parking requirements. Existing lots that are not redeveloped do not have to change. Confirm with your municipality; we lay out whatever the plan requires.

Related services

Book a free site visit

We measure, probe the base and check drainage, then send an itemized written quote within 48 hours. No obligation and no sales pitch.

Call now Free site visit